top of page
East Bay Power Systems

We offer two flexible options to suit your needs:

​

Option 1: Single Tesla Powerwall 3 Installation

​

•  Scope of Work:

​

•  Supply and installation of one Tesla Powerwall 3 unit.

​

•  Site assessment, electrical integration, and system commissioning.

​

•  Basic training on system operation and Tesla app usage.

​

•  Total Cost: $16,500 (includes all taxes, fees, and installation; excludes any custom electrical upgrades if needed).

​

•  Estimated Timeline: 4-6 weeks from approval.

​

Option 2: Upgrade to Two Tesla Powerwall 3 Units

​

•  Scope of Work:

​

•  All elements from Option 1, plus an additional Powerwall 3 unit for doubled capacity (27 kWh total).

​

•  Enhanced redundancy for whole-home backup and greater solar storage.

​

•  Total Cost: $26,000 (represents a value-added bundle with shared installation efficiencies).

​

•  Estimated Timeline: Same as Option 1.

​

Payment Terms: $1000.00 Deposit. 70% upon equipment delivery, balance due upon completion. Financing options available upon request, including low-interest loans and potential rebates/incentives (e.g., federal tax credits up to 30% under the Inflation Reduction Act—eligibility to be confirmed).

​

Optional SGIP Application. $750.00

Certified Telsa Installer

ADDRESS

6680 Alhambra Ave

Ste 421

Martinez, CA

94553

PHONE

925-364-6081

​

East Bay Power Systems

CSLB# 1098150

SOCIAL

  • Yelp!

@EastBayPowerSystems

©2024 East Bay Power Systems. Built by Upcode

bottom of page